• Commitment
    • About
    • Services
    • Sectors
    • The Commissioning Process
    • Foundations
    • Net Zero
    • CAN/ULC-S1001 Testing
    • Commerical
    • Civc + Culture
    • Education
    • RESIDENTIAL
    • HOSPITALITY
    • Healthcare
    • Retail
    • Mission Critical
    • Transportation
  • CAN/ULC-S1001 TESTING
  • Team
  • Contact
Menu

HRCx - Commissioning Consultancy

155 Gordon Baker Rd
Toronto, ON, M2H 3N5
(416) 364-2100

Your Custom Text Here

HRCx - Commissioning Consultancy

  • About
    • Commitment
    • About
    • Services
    • Sectors
    • The Commissioning Process
    • Foundations
    • Net Zero
    • CAN/ULC-S1001 Testing
  • PORTFOLIO
    • Commerical
    • Civc + Culture
    • Education
    • RESIDENTIAL
    • HOSPITALITY
    • Healthcare
    • Retail
    • Mission Critical
    • Transportation
  • CAN/ULC-S1001 TESTING
  • Team
  • Contact
Outside Building Logo #1.jpg

Rogers Communications Retro-Commissioning

HRCx is providing Existing Building Commissioning (EBCx) for Rogers Communications downtown campus located at 333 Bloor Street East and One Mount Pleasant Road. 333 Bloor Street East is a 10-storey building that measures approximately 330,000 ft² and One Mount Pleasant Road is a 17-storey building with approximately 640,000 ft² of space. Together, they house three chilled water systems.

HRCx has been retained to carry out the EBCx process, including Planning, Investigation, Implementation and Turn Over, to moderate energy costs, return building systems to design intent, and optimize performance.

Projected Completion: 2017

Rogers Communications Retro-Commissioning

HRCx is providing Existing Building Commissioning (EBCx) for Rogers Communications downtown campus located at 333 Bloor Street East and One Mount Pleasant Road. 333 Bloor Street East is a 10-storey building that measures approximately 330,000 ft² and One Mount Pleasant Road is a 17-storey building with approximately 640,000 ft² of space. Together, they house three chilled water systems.

HRCx has been retained to carry out the EBCx process, including Planning, Investigation, Implementation and Turn Over, to moderate energy costs, return building systems to design intent, and optimize performance.

Projected Completion: 2017