• Commitment
    • About
    • Services
    • Sectors
    • The Commissioning Process
    • Foundations
    • Net Zero
    • CAN/ULC-S1001 Testing
    • Commerical
    • Civc + Culture
    • Education
    • RESIDENTIAL
    • HOSPITALITY
    • Healthcare
    • Retail
    • Mission Critical
    • Transportation
  • CAN/ULC-S1001 TESTING
  • Team
  • Contact
Menu

HRCx - Commissioning Consultancy

155 Gordon Baker Rd
Toronto, ON, M2H 3N5
(416) 364-2100

Your Custom Text Here

HRCx - Commissioning Consultancy

  • About
    • Commitment
    • About
    • Services
    • Sectors
    • The Commissioning Process
    • Foundations
    • Net Zero
    • CAN/ULC-S1001 Testing
  • PORTFOLIO
    • Commerical
    • Civc + Culture
    • Education
    • RESIDENTIAL
    • HOSPITALITY
    • Healthcare
    • Retail
    • Mission Critical
    • Transportation
  • CAN/ULC-S1001 TESTING
  • Team
  • Contact

Bank of Montreal Barrie Computing Centre

HRCx acted as the mechanical commissioning agent for this 260,000 ft² computer centre as part of The HIDI Group’s team prior to the formation of HRCx. The facility includes a 60,000 ft² raised floor, 120,000 ft² office and atrium, and 80,000 ft² central utility building. 

Located in Barrie, Ontario, this was the first data centre in North America to achieve a Tier IV certification from the Uptime Institute.  Working closely with the design team and the client, the raised floor was turned over to BMO’s computer team a scant twenty-one months after the initial kick-off design meeting.

Completion Date: 2006

BMO Barrie Computer Centre.jpg

Data Centre Renovation & Refresh

HRCx has been appointed the commissioning team for the renovation and refresh of a confidential mission critical data centre in the Greater Toronto Area.

Data Centre - Inside_Suite.jpg

Darlington Retube Waste Processing Building

HRCx acted as a commissioning agent for the Retube Waste Processing Building (RWPB), located at the Darlington Nuclear Generation Facility in Bowmanville, Ontario. The RWPB is a new construction facility required as part of the Darlington Retube and Feeder Replacement (RFR) project to provide support to the Waste Tooling System (WTS) which optimizes water processing and packaging operations. The facility is equipped with specialized systems to maintain industry standards for safety and containment such as the Active Ventilation System (AVS), Radiation Stack Monitoring System, Fire Alarm Detection / Protection Systems, Public Address system, as well as emergency power. The project encompassed equipment verification and O&M documentation to ensure that building systems are functionally tested and capable of being operated and maintained to perform as intended. 

Completion Date: 2017

Darlington.jpg
prev / next
Back to Mission Critical
1
Bank of Montreal Barrie Computing Centre
1
Data Centre Renovation & Refresh
1
Darlington Retube Waste Processing Building

© 2025 HRCx