HRCx provided commissioning services for The Ottawa Hospital Emergency Department Ambulance Offload and Medicine Transition Unit Facility.
Working together with Cumulus Architects on this design build project, the team operated under tight deadline, codes and standard, hospital IPAC requirements and strict COVID-19 regulations to have the four season Insulated 90’ x 120’ stretched membrane structure up and running for incoming emergency department overflow. Located in the hospital’s parking lot the Ambulance Offload and Medicine Transition Unit Facility was developed to assist with patient overflow due to the COVID-19 pandemic. The structure utilizes conditioned corridors for direct access to the main building and access leading from the ambulance drop off.
Photos Courtesy of BLT Construction Services
HRCx will be providing commissioning services for the temporary onsite Pandemic Response Unit located on site at Joseph Brant Hospital. With the development of a modular treatment unit will enable the hospital the capacity to support the surge of COVID19 patients who require constant monitoring or oxygen and at the same time freeing up vital acute care space in there facilities for patients with more severe needs. The temporary Pandemic Response Unit will be completed by April 10 2020 and is a collaborating with community-based health care providers, the City of Burlington and Halton Region.
Once completed the 8250 ft² Response Unit will house a 93-bed unit dedicated to patients with mild to moderate symptoms of the virus and will help provide relief to the hospitals overwhelmed resources.
Photo Courtesy of BLT Construction Services
HRCx provided commissioning for the temporary onsite Pandemic Response Unit located on site at Trillium Health Partners. With the development of a modular treatment unit enabled the hospital to increase the capacity to support the surge of COVID19 patients who require constant monitoring or oxygen and at the same time freeing up vital acute care space in their facilities for patients with more severe needs.
The 50’x165’ Response Unit hold up to 80-plus patients and is situated on Mississauga Hospital’s south parking lot and is dedicated to patients with mild to moderate symptoms of the virus and provides relief to the hospitals overwhelmed resources.
The unit was completed and ready with appropriate supplies and equipment in April 2020.
Photos Courtesy of BLT Construction Services
HRCx provided commissioning services for the Sunnybrook Hospital healthcare facility, including the fit-out of two shell floors in the M-Wing (approximately 120,000 ft² of ambulatory clinics and wet and dry laboratories) as well as a 2-storey renovation in the S-Wing (approximately 36,000 ft²). The project was comprised of existing laboratory space, a new wet laboratory facility, procedure rooms, necropsy rooms and holding areas.
Completion Date: 2013