• Commitment
    • About
    • Services
    • Sectors
    • The Commissioning Process
    • Foundations
    • Net Zero
    • CAN/ULC-S1001 Testing
    • Commerical
    • Civc + Culture
    • Education
    • RESIDENTIAL
    • HOSPITALITY
    • Healthcare
    • Retail
    • Mission Critical
    • Transportation
  • CAN/ULC-S1001 TESTING
  • Team
  • Contact
Menu

HRCx - Commissioning Consultancy

155 Gordon Baker Rd
Toronto, ON, M2H 3N5
(416) 364-2100

Your Custom Text Here

HRCx - Commissioning Consultancy

  • About
    • Commitment
    • About
    • Services
    • Sectors
    • The Commissioning Process
    • Foundations
    • Net Zero
    • CAN/ULC-S1001 Testing
  • PORTFOLIO
    • Commerical
    • Civc + Culture
    • Education
    • RESIDENTIAL
    • HOSPITALITY
    • Healthcare
    • Retail
    • Mission Critical
    • Transportation
  • CAN/ULC-S1001 TESTING
  • Team
  • Contact
40e12e129174151.6165bb72e1f44.jpg

Sportsnet Studios

Opening in time for the 2021-2022 NHL season, the new Sportsnet Studios, located within the Rogers Communications Downtown Campus encompasses 20,400ft2. Designed by BDP Quadrangle the television broadcast studios was carved out of an existing floor plate that was prior used as office space and includes two broadcast studios, washrooms, storage rooms, rack rooms and two temporary control rooms with 2 new audio rooms. The project was split into two phases, first phase involving a feasibility study and second involving the design and build out.

The HIDI Group provided mechanical, electrical and plumbing while Alula Lighting Design provided architectural lighting and HRCx commissioned the project. Mechanical the team addressed the spaces HVAC, smoke venting, fire protection, plumbing and drainage systems while electrical the team addressed critical E2 and UPS power distribution, life safety systems, power for mechanical systems, power and systems rough-in for security, A/V, and communications, and architectural lighting controls.

Sportsnet Studios

Opening in time for the 2021-2022 NHL season, the new Sportsnet Studios, located within the Rogers Communications Downtown Campus encompasses 20,400ft2. Designed by BDP Quadrangle the television broadcast studios was carved out of an existing floor plate that was prior used as office space and includes two broadcast studios, washrooms, storage rooms, rack rooms and two temporary control rooms with 2 new audio rooms. The project was split into two phases, first phase involving a feasibility study and second involving the design and build out.

The HIDI Group provided mechanical, electrical and plumbing while Alula Lighting Design provided architectural lighting and HRCx commissioned the project. Mechanical the team addressed the spaces HVAC, smoke venting, fire protection, plumbing and drainage systems while electrical the team addressed critical E2 and UPS power distribution, life safety systems, power for mechanical systems, power and systems rough-in for security, A/V, and communications, and architectural lighting controls.

40e12e129174151.6165bb72e1f44.jpg
30ed8d129174151.6165bb72e1457.jpg
ed8901129174151.6165bb72df9f4.jpg
aae42f129174151.6165bb72e19bd.jpg
Green Room - Rogers_211006_SN_0029_HiRes-AM.jpg
60262e129174151.6165bb72e311c.jpg

© 2025 HRCx